Monday 16 May 2016

supercharger mount

A bit more work on mounting the supercharger

checking gaps, belt route, pulley size (prob 60mm 1:1 ratio)


only 50mm gap between the SC and the head, so its an up and over tube arrangment

whilst changing over the fill casting, the last person ommitted to fit a nut on the lobe gears

its a strange size, 14mm x 1mm thread very fine



managed to weld a temporary mount together in steel just to see what fits where etc etc.

think i'm going with 60mm pulleys 1:1 ratio in order for the ribbed belt to follow the starter chain route.
up and over 1.5" tube to the inlets .
there's only 50mm gap between charger and cyl block, so inlet will start off going down into the starter motor area and up to the right side
whilst changing over the oil fill casting, I noticed a nut missing off one of the gears
managed to weld a temporary mount together in steel just to see what fits where etc etc.

[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_001_zpslb4mysug.jpg[/IMG]
think i'm going with 60mm pulleys 1:1 ratio in order for the ribbed belt to follow the starter chain route.
up and over 1.5" tube to the inlets .
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_002_zps5fz1jxiv.jpg[/IMG]
there's only 50mm gap between charger and cyl block, so inlet will start off going down into the starter motor area and up to the right side
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_003_zps9culdonn.jpg[/IMG]
whilst changing over the oil fill casting, I noticed a nut missing off one of the gears
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160508_002_zpsjskrllid.jpg[/IMG]
managed to weld a temporary mount together in steel just to see what fits where etc etc.

[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_001_zpslb4mysug.jpg[/IMG]
think i'm going with 60mm pulleys 1:1 ratio in order for the ribbed belt to follow the starter chain route.
up and over 1.5" tube to the inlets .
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_002_zps5fz1jxiv.jpg[/IMG]
there's only 50mm gap between charger and cyl block, so inlet will start off going down into the starter motor area and up to the right side
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_003_zps9culdonn.jpg[/IMG]
whilst changing over the oil fill casting, I noticed a nut missing off one of the gears
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160508_002_zpsjskrllid.jpg[/IMG]
managed to weld a temporary mount together in steel just to see what fits where etc etc.

[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_001_zpslb4mysug.jpg[/IMG]
think i'm going with 60mm pulleys 1:1 ratio in order for the ribbed belt to follow the starter chain route.
up and over 1.5" tube to the inlets .
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_002_zps5fz1jxiv.jpg[/IMG]
there's only 50mm gap between charger and cyl block, so inlet will start off going down into the starter motor area and up to the right side
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_003_zps9culdonn.jpg[/IMG]
whilst changing over the oil fill casting, I noticed a nut missing off one of the gears
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160508_002_zpsjskrllid.jpg[/IMG]
managed to weld a temporary mount together in steel just to see what fits where etc etc.

[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_001_zpslb4mysug.jpg[/IMG]
think i'm going with 60mm pulleys 1:1 ratio in order for the ribbed belt to follow the starter chain route.
up and over 1.5" tube to the inlets .
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_002_zps5fz1jxiv.jpg[/IMG]
there's only 50mm gap between charger and cyl block, so inlet will start off going down into the starter motor area and up to the right side
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_003_zps9culdonn.jpg[/IMG]
whilst changing over the oil fill casting, I noticed a nut missing off one of the gears
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160508_002_zpsjskrllid.jpg[/IMG]
managed to weld a temporary mount together in steel just to see what fits where etc etc.

[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_001_zpslb4mysug.jpg[/IMG]
think i'm going with 60mm pulleys 1:1 ratio in order for the ribbed belt to follow the starter chain route.
up and over 1.5" tube to the inlets .
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_002_zps5fz1jxiv.jpg[/IMG]
there's only 50mm gap between charger and cyl block, so inlet will start off going down into the starter motor area and up to the right side
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_003_zps9culdonn.jpg[/IMG]
whilst changing over the oil fill casting, I noticed a nut missing off one of the gears
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160508_002_zpsjskrllid.jpg[/IMG]
managed to weld a temporary mount together in steel just to see what fits where etc etc.

[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_001_zpslb4mysug.jpg[/IMG]
think i'm going with 60mm pulleys 1:1 ratio in order for the ribbed belt to follow the starter chain route.
up and over 1.5" tube to the inlets .
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_002_zps5fz1jxiv.jpg[/IMG]
there's only 50mm gap between charger and cyl block, so inlet will start off going down into the starter motor area and up to the right side
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_003_zps9culdonn.jpg[/IMG]
whilst changing over the oil fill casting, I noticed a nut missing off one of the gears
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160508_002_zpsjskrllid.jpg[/IMG]
managed to weld a temporary mount together in steel just to see what fits where etc etc.

[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_001_zpslb4mysug.jpg[/IMG]
think i'm going with 60mm pulleys 1:1 ratio in order for the ribbed belt to follow the starter chain route.
up and over 1.5" tube to the inlets .
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_002_zps5fz1jxiv.jpg[/IMG]
there's only 50mm gap between charger and cyl block, so inlet will start off going down into the starter motor area and up to the right side
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160515_003_zps9culdonn.jpg[/IMG]
whilst changing over the oil fill casting, I noticed a nut missing off one of the gears
[IMG]http://i73.photobucket.com/albums/i231/drewpy_1/tracker/supercharging/WP_20160508_002_zpsjskrllid.jpg[/IMG]